Pay-on-foot is a parking payment method in which drivers pay at a station inside the facility, usually on the walk back to their vehicle, so the exit lane only has to read a paid ticket, credential or license plate.
California's Density Bonus Law (Government Code 65915) lets a housing developer build more homes than local zoning allows, and obtain incentives, waivers and capped parking ratios, in exchange for including deed-restricted affordable or senior housing. It is the oldest and most used tool in the state's housing law stack.
Dwell time is the length of time a vehicle occupies a parking space, curb segment, loading zone or charger, from arrival to departure.
A master plan is a long-range document that sets the framework for how a community, district, campus or large site will develop over time.
Event parking is parking for venues and occasions that draw large crowds at a set time, such as stadiums, arenas, concerts, festivals and conventions. Its defining feature is that thousands of vehicles arrive in a short window and try to leave at the same moment.
A mobility court is the curb rebuilt as a designed facility for fleet-scale pick-up and drop-off: organized queuing, protected pedestrian space, and clear assignment among modes.
Valet parking is a service in which staff take a customer’s vehicle at a drop-off point, park it, and return it when the customer asks for it.
Parking enforcement is the set of activities that make parking rules work: monitoring vehicles, issuing citations, booting or towing, and handling payments and appeals. Without it, time limits, prices and permits are suggestions.
Deflection is the amount a structural member, such as a beam, slab or double tee, bends or sags under load.
Bidirectional charging is EV charging hardware and vehicle capability that lets power flow both ways: from the grid into the battery, and from the battery back out to a home, a building, or the grid.
Dynamic signage, also called digital or electronic signage, is signage whose message can be changed remotely or automatically, using LED, LCD or similar displays, so it can show live information such as available spaces, closures, directions and rates.
DC fast charging (DCFC), often called Level 3 charging, delivers direct current at up to 400 kW, the charging class for dwell times that cannot wait.
A parking pro forma is the forward financial model of a facility: revenue by product, operating expenses, capital reserves and debt service, projected over the expected holding period.
A time-of-use (TOU) rate is an electricity tariff that charges different prices at different hours of the day, higher during the evening peak and lower overnight or at midday.
AB 1317 is a California law that requires owners of new apartment buildings with 16 or more units in ten counties, including Los Angeles, to separate the cost of parking from rent. Parking must be offered under its own agreement, so tenants who do not need a stall do not pay for one.
A parking meter is a device that collects payment for the right to park in a curb space for a set time. The first installed parking meters went into service in Oklahoma City in 1935, invented to keep downtown spaces turning over rather than to raise money.
Curtailment is the deliberate reduction of output from a generator, most often solar or wind, because the grid cannot absorb it at that moment.
License plate recognition (LPR), also called automatic license plate recognition (ALPR), uses cameras and software to capture an image of a vehicle and read its license plate automatically.
A parking facility’s circulation system is the arrangement of ramps, aisles and turns that moves vehicles in, between levels, past available spaces and out.
Pay-by-plate is a parking payment method in which the driver enters the vehicle's license plate number at a pay station, app or web page, and the payment is linked to that plate rather than to a space number or a printed receipt.
Design-build (DB) is a project delivery method in which the owner holds a single contract with one entity, the design-builder, which is responsible for both designing and constructing the project.
Right-sizing is setting a parking supply, and the type of facility that provides it, from measured or modeled demand rather than from a legacy ratio, a code minimum or a negotiated number.
Net peak is the hour of highest electricity demand after subtracting solar and wind output, which on a solar-heavy grid falls in the early evening rather than mid-afternoon.
A traffic study is an analysis of traffic patterns, flow and safety in a specific area or along a roadway, usually to understand existing conditions or predict the effect of a new project. It is prepared by transportation engineers and reviewed by the local agency.
Browse by topic
Pick a topic to narrow the list below, or open its own page.