Every parking facility is a financial decision before it is a building. These terms cover how parking projects are evaluated and funded, from the pro forma and the cap rate to bonds, public-private partnerships and concessions, and how operations become value through net operating income.
They also cover how projects are bought and built: the procurement methods that select designers, builders and vendors, and the delivery models, from design-bid-build to progressive design-build, that decide who carries which risk.
Start here
The Parkonomics view
A garage is a forty-year asset financed on five-year assumptions. The projects that age well are the ones whose numbers were stress-tested for lower demand and whose contracts kept the owner in control of the data and the future.
From Parkonomics
Every Finance and Project Delivery term
40 terms
A
- Availability PaymentAn availability payment is a periodic payment a public owner makes to a private partner in a public-private partnership for keeping a facility available...
B
- Best Value ProcurementBest value procurement is a method of selecting a contractor or design-build team by weighing price together with non-price factors such as experience, technical...
- Bond CounselBond Counsel refers to a specialized attorney or law firm that provides legal advice and services related to the issuance of municipal bonds.
- Bridging DocumentsBridging documents are a partial design prepared by an owner's own architect or engineer, typically developed to somewhere between 15 and 35 percent, and...
- Budget PricingBudget Pricing refers to an approximation of the costs associated with an activity, job, program, or project, prepared for budgeting and planning purposes only.
C
- Capitalization (Cap) RateThe capitalization rate, or cap rate, is the ratio of a parking asset's net operating income (NOI) to its value. It is the market's...
- Construction ManagerA construction manager (CM) is a firm or professional that manages the planning, cost, schedule and execution of a construction project for an owner,...
- Construction Manager at Risk (CMAR)Construction manager at risk (CMAR) is a project delivery method in which the owner hires a construction manager during design to provide preconstruction services,...
D
- Debt Service Coverage Ratio (DSCR)The debt service coverage ratio (DSCR) is a facility's net operating income divided by its annual debt service, the principal and interest owed on...
- Design-Bid-BuildDesign-bid-build (DBB) is the traditional project delivery method in which the owner hires a designer to complete the construction documents, then solicits bids on...
- Design-BuildDesign-build (DB) is a project delivery method in which the owner holds a single contract with one entity, the design-builder, which is responsible for...
- Dynamic Pricing (Parking)Dynamic pricing, or demand-based pricing, adjusts parking rates by time, location, event or occupancy to manage how full parking is and how much it...
E
- Equity FinancingEquity Financing involves raising funds by selling ownership shares or equity stakes in the project to investors.
F
- Financial Feasibility Analysis/StudyFinancial Feasibility Analysis Study is a comprehensive evaluation that assesses parking needs, the cost of recommended improvements, and projected revenues and costs.
- First CostFirst Cost refers to the initial expense incurred in the planning, design, and construction of a parking facility.
- Flat Fee PricingFlat fee pricing, often called flat rate parking, charges one set price for a stay regardless of how long the vehicle remains, usually within...
G
- Gross Leasable Area (GLA)Gross leasable area (GLA) is the total floor area designed for tenants' exclusive use and occupancy, the space they lease and pay rent on,...
- Guaranteed Maximum Price (GMP)A guaranteed maximum price (GMP) is a construction contract price in which the contractor is reimbursed for the actual cost of the work plus...
H
- Hard construction costsHard Construction Costs refer to the direct expenses associated with the physical construction of a parking facility.
I
- Integrated Project Delivery (IPD)Integrated project delivery (IPD) is a project delivery method in which the owner, designer and builder, and often key trade partners, sign a single...
L
- Life Cycle Cost (LCC)Life-cycle cost (LCC) is the total cost of owning an asset over its useful life, including design and construction, operation, maintenance, repair, replacement and...
- Lowest Price Technically Acceptable (LPTA)Lowest price technically acceptable (LPTA) is a procurement method in which proposals are first checked against minimum technical requirements, and the contract goes to...
M
- Municipal BondsMunicipal bonds are debt securities issued by states, cities, counties and public authorities to finance public projects, including parking garages. Interest is often exempt...
N
- Net Operating Income (NOI)Net operating income (NOI) is a property's revenue minus its operating expenses, before debt service, income taxes, depreciation and major capital spending. For a...
- Net Rentable Area (NRA)Net rentable area (NRA), also called rentable area, is the floor area of a building on which a landlord charges rent: the tenant's usable...
O
- Operating ExpensesOperating expenses are the ongoing costs of running a parking facility, from staff and utilities to insurance, maintenance and technology, as distinct from capital...
P
- ParadigmA paradigm is a shared framework of assumptions, methods and examples that shapes how a field understands its problems. The philosopher and historian of...
- Parking ConcessionA parking concession is a long-term agreement in which a public or institutional owner grants a private concessionaire the right to operate a parking...
- Parking Rate/FeeA parking rate, or parking fee, is the price a driver pays to park, usually based on the length of stay, the time of...
- Pro Forma (Parking)A parking pro forma is the forward financial model of a facility: revenue by product, operating expenses, capital reserves and debt service, projected over...
- Progressive Design-Build (PDB)Progressive design-build (PDB) is a form of design-build in which the owner selects a single design-build team primarily on qualifications, before design is developed,...
- Public-Private Partnership (P3)A public-private partnership (P3) is a long-term agreement in which a public owner transfers some combination of design, construction, financing, operation and maintenance of...
R
- Request for Proposal (RFP)A request for proposal (RFP) is a formal document an organization uses to invite proposals from potential providers, such as parking operators, technology vendors,...
- Return on Investment (ROI)Return on investment (ROI) is a measure of profitability that compares the gain from an investment with its cost, usually expressed as a percentage:...
- Revenue ShareA revenue share is an arrangement in which parking revenue is split between two parties by an agreed formula, typically between a facility owner...
- Rough Order-of-Magnitude (ROM)A rough order of magnitude (ROM) estimate is an early cost range used to judge whether a project is worth pursuing before any meaningful...
S
- Sale-Leaseback ArrangementA sale-leaseback is a transaction in which the owner of a property sells it to an investor and simultaneously signs a long-term lease to...
- Soft Construction CostsSoft construction costs refer to the indirect expenses associated with a construction project that are not directly related to the physical construction of a...
- Subscription RateA subscription rate is a commercial electricity tariff in which the customer reserves a block of capacity in kilowatts for a fixed monthly fee...
T
- Tax Increment Financing (TIF)Tax Increment Financing (TIF) is a public financing method that is utilized for subsidizing redevelopment, infrastructure, and other community-improvement projects.