First cost is the initial cost of designing, building and equipping a facility, before it opens and starts incurring operating and maintenance costs.
It is the number that drives most budget decisions, because it has to be financed up front. For a parking structure meant to last 50 years or more, though, the money spent after opening on maintenance, repairs, energy and staff usually exceeds the first cost. Comparing options on life-cycle cost puts both in the same frame.
Where first cost and long-term cost pull apart
- Durability. Better concrete, sealers and membranes cost more now and less later. See chloride-ion contamination.
- Lighting. LED fixtures and controls cost more than older lamps but use far less energy. See adaptive lighting.
- Technology. Cheaper equipment can carry higher support and replacement costs.
- Flexibility. Flat floors and taller ceilings add cost but keep adaptive reuse possible.
The Parkonomics view
First cost is real money and it deserves scrutiny. But a garage that saved a million dollars on opening day and spends three million on repairs twenty years later was not a bargain.
Related terms: Life-Cycle Cost, Hard Construction Costs, Soft Construction Costs, Future-Flexible Design, Budget Pricing, Pro Forma