Future-flexible design is preparing a parking asset to absorb coming requirements, EV mandates, AV operations, reuse, without redesign: make-ready capacity banked, loads planned, geometry that adapts. In a parking facility:
- The practical horizon is the next five to ten years of operational change, not a distant total conversion.
Considerations
- Flexibility is bought cheapest during original construction. The future-flexible asset answers the next mandate with capacity it already owns.