Both Ends of Sepulveda

A 4,300-space LAX garage built for a train has run on shuttle buses for five years. A few miles north, Culver City is trading curb parking for bus lanes on the same corridor.

By Andrew Sachs, PTMP November 18, 2026 9 MIN READ
Illustration of the LAX people mover on an elevated guideway above a boulevard with a red bus-only lane, a bus, palm trees and a parking garage

4,300.

That is the number of parking spaces in LAX Economy Parking, the garage at the West Intermodal Transportation Facility. It opened in October 2021, designed around a station: travelers were supposed to park, cross a bridge, and ride the Automated People Mover to their terminal. The train was due in 2023. A shuttle bus would cover the gap until then.7,8

The shuttle is still running. Five years and a month later, the garage that was built to be served by a train is still served by a bus. If the people mover opens on its builder’s current forecast, that bus will have carried the garage for five years and three months.

Last week brought news from both ends of Sepulveda Boulevard, and combined they say something useful about what a parking space is worth when it is, or is not, connected to something.10

November 9, 2026 at a glance

LAX people mover bonds
B-minusFitch cut $1.2 billion of senior bonds from BB; still on watch negative
Builder’s forecast
Feb 5, 2027LINXS target for Passenger Service Availability, per Fitch
Long-stop date
Dec 8, 2026Missing it is a technical event of default
Culver City vote
ApprovedSepulveda Connects, 2.3 miles from Venice Blvd to Slauson Ave
Curb traded
1.8 milesBus-only lanes from parking on one side; the other side keeps its parking
Price tags
$3.3B vs. $4.5MSkyLink total cost vs. the top of Sepulveda Connects’ estimate
Sources: Fitch Ratings via The Bond Buyer; Westside Today; City News Service.

The south end: a train that pays only when it carries people

On November 9, Fitch Ratings cut the $1.2 billion of senior bonds behind the LAX people mover, now branded SkyLink, from BB to B-minus and kept them on watch for further downgrades.1 The bonds were issued in 2018 through the California Municipal Finance Authority for LINXS, the private consortium that is building, financing, operating and maintaining the 2.25-mile line under a public-private partnership with Los Angeles World Airports (LAWA).

The mechanics matter more than the rating. This is an availability-payment deal. LAWA has no obligation to begin paying LINXS until the parties agree the system is open to passengers, and those payments are what service the bonds. Fitch sees passenger service by the December 8 long-stop date as a near impossibility. Missing it is a technical event of default, which can open the door to termination notices. December interest is covered by equity and letter-of-credit backed funds; Fitch estimates the project’s remaining cash runs out around mid-2027.1,3

Construction is roughly 99 percent complete. Fitch’s November 9 report states that LINXS is now forecasting February 5, 2027 for Passenger Service Availability, the contract milestone that starts the payments. That is about two months past the long-stop date.2 The two parties remain in active disputes, but Fitch’s own read is that the line is so essential to LAX access that both sides have every reason to finish it.1

The date that kept movingTimeline from 2021 to 2027. The LAX Economy Parking garage opened in October 2021 with an interim shuttle that is still running. Reported opening targets for the people mover rose like a staircase: 2023, 2024, 2025, January 2026, August 2026, October 2026, early January 2027, and now February 5, 2027, which is LINXS’s forecast in Fitch’s November 9, 2026 report. The December 8, 2026 long-stop date is marked.The date that kept movingReported SkyLink opening targets, plotted where each one landed on the calendar2021202220232024202520262027Long-stop date, Dec 8, 2026202320242025Jan 2026Aug 2026Oct 2026Early Jan 2027Feb 5, 2027LINXS forecast, per Fitch, Nov 9Economy Parking opens Oct 19, 2021; interim shuttle runs to the terminalsNowYear-only targets are placed mid-year. Sources: LAWA; Airline Geeks; Trains; Urbanize LA; Streetsblog LA; The Bond Buyer; City News Service; Fitch Ratings.
Figure 1. The date that kept moving. Each reported opening target for SkyLink, placed where it fell on the calendar, against the shuttle that has served LAX Economy Parking since it opened. Sources: see source 11.

For parking people, the point is this: the people mover is not a train project with some parking attached. It is the connective tissue of a parking and ground access system. It was meant to tie together the West ITF garage, the East ITF at the LAX/Metro Transit Center, and the consolidated rental car facility, which was designed to take rental car shuttles off the terminal loop entirely.12 Every one of those assets was priced, sized and located on the assumption that a train would carry its users the last mile. Until it does, the shuttles remain an operating cost the plan was designed to retire, and the garage’s value proposition stays incomplete.

The north end: a curb traded for a schedule

The same night Fitch acted, the Culver City Council approved conceptual plans for Sepulveda Connects, a 2.3-mile overhaul of Sepulveda between Venice Boulevard and Slauson Avenue. The plan includes 1.8 miles of bus-only lanes created by converting curbside parking on one side of the street, while keeping street parking on the other side. It adds 1.2 miles of protected bike lanes between Culver Boulevard and Ballona Creek, keeps at least two general travel lanes each way plus a center turn lane, and upgrades crossings at busy intersections. Estimated cost: $3.5 million to $4.5 million, mostly grant funded. A construction contract comes back to council later.4

The buses it speeds up are Culver CityBus Line 6 and Rapid 6, which carry roughly 6,700 to 6,800 riders a day between UCLA and LAX. More than one in five runs arrives late.4,5

The parking tradeoff was not abstract. During the 2025 hearings on the project’s guiding principles, a council member who owns a market on the corridor told colleagues that a survey of his customers found 45 percent parked on Sepulveda.6 The adopted plan answers that directly: it takes the curb on one side, not both, and keeps the center turn lane for business access. That is a curb management decision made block by block, not an ideology.

What connects them

Rapid 6 runs to LAX. The bus lanes in Culver City and the people mover at the airport are, in a real sense, two segments of one trip. One cost $3.3 billion and is waiting on a contract milestone.9 The other costs a few million dollars and reallocates a lane of parked cars.

One corridor, two endsSchematic of Sepulveda Boulevard from UCLA south to LAX. In Culver City, a 2.3-mile segment between Venice Boulevard and Slauson Avenue is highlighted, where 1.8 miles of bus-only lanes will replace curb parking on one side of the street. At LAX, the 2.25-mile SkyLink people mover crosses Sepulveda and links the terminals, the West ITF economy parking garage with about 4,300 spaces, the LAX/Metro Transit Center and the rental car center. It is not yet carrying passengers; an interim shuttle has served the garage since October 2021.One corridor, two endsSepulveda Boulevard from UCLA to LAX, and the two projects that made news on November 9UCLA / WestwoodVenice BlvdCulver BlvdSlauson AveBallona CreekNORTH END: CULVER CITYSepulveda Connects, 2.3 miles1.8 miles of bus-only lanes from curb parkingon one side; parking stays on the other sideServes Line 6 and Rapid 6, UCLA to LAX$3.5 million to $4.5 million, mostly grantsSOUTH END: LAXTerminalsCTA, 3 stationsWest ITFEconomy Parking, ~4,300East ITFLAX/Metro Transit CenterConRACRental car centerSkyLink people mover, 2.25 milesNot yet in passenger service; LINXS forecasts Feb 5, 2027Shuttle: interim service between the garage and terminals since Oct 2021Schematic, not to scale. Sources: City of Culver City; Westside Today; LAWA; Fitch Ratings.
Figure 2. One corridor, two ends. Sepulveda Connects reallocates curb in Culver City; at LAX, SkyLink crosses Sepulveda on its way from the terminals to the garage, the Metro station and the rental car center. Schematic, not to scale.

Both are bets on the same proposition: a parking space or a curb lane is worth more as part of a reliable connection than as storage on its own. The airport built the garage first and is waiting on the connection. Culver City is building the connection by giving up some storage. Neither path is wrong. They simply carry very different risk profiles, and those risks land on parking owners, operators and the businesses that depend on them.

Figure 3

Two ways to buy a connection

South end: LAX

Build the garage, then the link

$3.3 billion

SkyLink, 2.25 miles, six stations

What has to go right

A single contract milestone: Passenger Service Availability, agreed by both parties

Who feels a slip

Bondholders, the airport, and every parker, renter and traveler still riding a shuttle

North end: Culver City

Build the link, give up storage

$3.5M to $4.5M

Sepulveda Connects, 2.3 miles, 1.8 miles of bus lanes

What has to go right

Buses run faster and more reliably; businesses keep enough curb on the other side

Who feels a slip

Corridor merchants and nearby lots that absorb the displaced parkers

Figure 3. Costs as reported: SkyLink total cost from City News Service; Sepulveda Connects estimate from Westside Today. Not a per-mile comparison of like projects; a comparison of where the risk sits.

The airport built the garage first and is waiting on the connection. Culver City is building the connection by giving up some storage.

Andrew Sachs

Five moves for owners, operators and cities

  • Price the gap, not just the endpoint. When a facility’s demand depends on a connection that does not exist yet, budget the interim service (shuttles, staffing, wayfinding) as a real line item with a real duration. Five years of shuttle operations is not a contingency; it is a business model.
  • Read the payment trigger. In availability-payment P3s, the definition of “open to passengers” governs cash flow. Anyone whose revenue depends on an adjacent transit opening should understand that trigger and its long-stop date.
  • Count the curb before you lose it. Culver City’s plan kept parking on one side because someone measured who parks there. Business districts facing a lane conversion should bring their own occupancy and customer-origin data to the table, early.
  • Expect the off-street system to absorb the curb. When on-street spaces convert to bus lanes, demand shifts to nearby lots and structures as spillover parking. Owners along converted corridors should revisit rates, validation programs and signage now, before the striping goes down.
  • Plan garages around the trip, not the stall. The LAX garage and the Sepulveda curb tell the same story from opposite directions: parking value comes from what the space connects to. Design PARCS, payment and wayfinding so a facility can serve transit riders, rideshare and drivers as those mixes change.

What we still do not know

We do not know whether LINXS will hit its February 5 forecast, whether LAWA will agree that the system is open on that date, or how the parties will handle the gap past the December 8 long-stop date. The terms of any settlement between them are not public. We do not yet know how many curb spaces Sepulveda Connects removes in total, how the Sunkist Park cut-through mitigations will be finalized, or when construction begins. We will update this note as those answers arrive. For more on how LAX manages its curb, see Pricing the Curb: How LAX Can Get More From Its $30 Billion Investment.

Andrew Sachs, PTMP, is president of Gateway Parking Services, a parking consultancy and systems integrator.

Sources

  1. The Bond Buyer, “LAX people mover P3 bonds cut five notches deeper into junk,” Nov. 2026. bondbuyer.com
  2. Fitch Ratings, rating action report on California Municipal Finance Authority senior lien revenue bonds (LINXS APM Project), Nov. 9, 2026. LINXS Passenger Service Availability forecast of Feb. 5, 2027.
  3. The Bond Buyer, “Bondholders agree to ease key deadline for LAX people mover,” 2026. bondbuyer.com
  4. Westside Today, “Culver City Council approves major overhaul for Sepulveda Boulevard transit corridor,” Nov. 11, 2026. westsidetoday.com
  5. City of Culver City, Sepulveda Connects project page and Guiding Principles (amended Oct. 29, 2025). culvercity.gov
  6. Culver City Crossroads, “City Approves Sepulveda Connects: Planning for LA28 and More,” Oct. 2025. culvercitycrossroads.com
  7. Los Angeles World Airports, Construction Hot Topics, week of Oct. 18, 2021 (LAX Economy Parking opening and interim shuttle). lawa.org
  8. Los Angeles World Airports, news release, 2022 (approximately 4,300 spaces at LAX Economy Parking). lawa.org
  9. City News Service via ABC7, “LAX People Mover’s opening delayed again, this time until at least January 2027,” Sept. 25, 2026. abc7.com
  10. Urbanize LA, “LAX people mover bonds, Culver City brings bus/bike lanes to Sepulveda, and more,” Nov. 2026. la.urbanize.city
  11. Opening targets in Figure 1: LAWA (2023), lawa.org; Airline Geeks (2024), airlinegeeks.com; Trains (2025), trains.com; Urbanize LA (Jan. 2026), la.urbanize.city; Streetsblog LA (Aug. 2026), la.streetsblog.org; The Bond Buyer (Oct. 2026), bondbuyer.com; City News Service (early Jan. 2027), source 9; Fitch Ratings (Feb. 5, 2027), source 2.
  12. The Bond Buyer, “Los Angeles airport deal brings $650 million of revenue bonds,” 2018 (ConRAC connection to the people mover). bondbuyer.com
Share LinkedIn Facebook X
Andrew Sachs, PTMPA
About the Author
Andrew Sachs, PTMP

Andrew Sachs, PTMP, is co-founder and editor of Parkonomics and President of Gateway Parking Services, a parking consultancy and PARCS systems integrator.

Read Next