This page is a working demonstration for NPA and Council leadership. Enter the preview phrase to continue.
The systems the patron actually touches: the accessible space and the route it anchors, the wayfinding chain, the signs, the light, and the air. This is the part where the building's obligations to every person walking through it get counted, drawn, and lit -- and where the accessibility family's canonical dimension set lives.
How many accessible spaces, which are van, and where they go -- with the live calculator.
Read the module →Alterations, barrier removal, and the triggers: which rung of the obligation ladder the project stands on.
Read the module →The route is a chain: stall, aisle, path, ramp, elevator, door -- as compliant as its worst link.
Read the module →Six handoffs from approach to return, each with its own decision point and failure mode.
Read the module →The sign hierarchy: authority first, direction second, identity third, atmosphere last.
Read the module →IES zones and uniformity -- with the numeric levels honestly held under an open author query.
Read the module →The best LED case in the building stock: long hours, high counts, brutal relamping access.
Read the module →Natural vs. mechanical with CO sensing -- and fan sizing left with the engineer of record.
Read the module →